top of page

Ekolojik Enerji Biogas Plant

Industrial Waste Biogas Plants

2.4MWe

About the project

In the Ekolojik Enerji Çorlu Integrated Waste Management Facility, various food wastes (such as ice cream, chocolate, milk, etc.) are converted into biogas through the fermentation process, thanks to the two anaerobic digesters installed within the facility. It is equipped with special feeding units to accommodate different types of wastes.


Hochreiter Biyogaz has provided engineering services for the commissioning and completion of the installation of the facility, which has already been designed and is in the stage of installation.

Project Details

Facility Type

Industrial Waste Biogas Plants

Customer

Year Built

2017

Capacity

2.4MWe

Waste Types

  •  Food Production Facilities Wastes

Ekolojik Enerji

Property Location

bottom of page