top of page
About the project
In the Ekolojik Enerji Çorlu Integrated Waste Management Facility, various food wastes (such as ice cream, chocolate, milk, etc.) are converted into biogas through the fermentation process, thanks to the two anaerobic digesters installed within the facility. It is equipped with special feeding units to accommodate different types of wastes.
Hochreiter Biyogaz has provided engineering services for the commissioning and completion of the installation of the facility, which has already been designed and is in the stage of installation.
Project Details
Facility Type
Industrial Waste Biogas Plants
Customer
Year Built
2017
Capacity
2.4MWe
Waste Types
Food Production Facilities Wastes
Ekolojik Enerji
Property Location
bottom of page